Sign In | Join Free | My xuijs.com
China Shijiazhuang Zhengzhong Technology Co., Ltd logo
Shijiazhuang Zhengzhong Technology Co., Ltd
Global Leading Bolted Tanks Manufacturer
Verified Supplier

10 Years

Home > Biogas Plant Project >

Center Enamel Drives Biogas Development in Bosnia and Herzegovina with Advanced CSTR Reactor Tanks

Shijiazhuang Zhengzhong Technology Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Center Enamel Drives Biogas Development in Bosnia and Herzegovina with Advanced CSTR Reactor Tanks

Brand Name : CEC TANKS

Model Number : W

Certification : ISO 9001:2008, AWWA D103 , OSHA , BSCI

Place of Origin : China

MOQ : 1set

Price : $5000~$20000 one set

Payment Terms : L/C, T/T

Supply Ability : 60 sets per month

Delivery Time : 10-30 days after deposit received

Packaging Details : PE poly-foam between each two steel plates ; wooden pallet and wooden

Coating thickness : 0.25mm~0.40mm , two layer of coating internal and external

Adhesion : 3,450N/cm

Service life : ≥30 years

Steel grade : ART 310

Size Of Panel : 2.4M * 1.2M

Acid and alkalinity proof : Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14

Capactiy available : 20 m3 to 18,000 m3

Easy to clean : Smooth, glossy, inert, anti-adhesion

Steel plates thickness : 3mm - 12mm , depends on the diameter & height

Usage : Waste water treatment , sewage treatment, effluent treatment, ect.

Easy to cle : Smooth, glossy, inert, anti-adhesion

Warranty period : 2 years free of charge

Installation : By jacking machine or steel pole, fast in installation

Defect free : Minimum maintenance needed

Impact Resistance : Excellent

Contact Now

Center Enamel Drives Biogas Development in Bosnia and Herzegovina with Advanced CSTR Reactor Tanks

Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel), a global leader in bolted storage tank solutions, has successfully delivered high-performance Continuously Stirred Tank Reactor (CSTR) tanks for a key biogas project in Bosnia and Herzegovina. This accomplishment underscores Center Enamel's dedication to supporting the growth of renewable energy initiatives in the Balkan region and contributing to Bosnia and Herzegovina's sustainable energy goals.

Bosnia and Herzegovina's Biogas Vision: Fostering Sustainable Energy and Waste Management

Bosnia and Herzegovina is actively exploring and developing renewable energy sources to diversify its energy mix and promote environmental sustainability. Biogas technology plays a vital role in this vision, offering a sustainable solution for organic waste management and renewable energy production. By efficiently converting organic waste into biogas, Bosnia and Herzegovina aims to enhance energy security and reduce its environmental footprint.

Center Enamel's CSTR Reactor Tanks: The Foundation of Efficient Anaerobic Digestion in Bosnia and Herzegovina

Center Enamel's CSTR reactor tanks were chosen for this project due to their proven efficiency, reliability, and robust design, essential for optimizing anaerobic digestion processes in the context of Bosnia and Herzegovina's biogas sector. These tanks are engineered to:

Maximize Biogas Production: The continuous and efficient stirring mechanism ensures optimal mixing of feedstock and microorganisms, leading to efficient breakdown of organic matter and consistently high biogas yields, even with diverse local feedstocks.

Ensure Stable and Consistent Performance: The reactor's robust design, coupled with precise temperature control capabilities, maintains stable operating conditions, minimizing process fluctuations and maximizing efficiency, crucial for Bosnia and Herzegovina's climate.

Provide Exceptional Long-Term Durability and Corrosion Resistance: Constructed with Center Enamel's renowned Glass-Fused-to-Steel (GFS) technology, the reactor offers unparalleled corrosion resistance, guaranteeing a long service life and minimal maintenance requirements, even in the region's diverse environmental conditions.

Offer Tailored Customization and Seamless Integration: Center Enamel provides comprehensive custom engineering to meet the specific needs of each project, ensuring the CSTR reactor seamlessly integrates into the complete biogas system, adapting to Bosnia and Herzegovina's specific project requirements.

Key Advantages of Center Enamel's CSTR Reactor for Bosnia and Herzegovina Biogas Projects:

Superior Glass-Fused-to-Steel (GFS) Technology: Provides exceptional corrosion resistance and long-term durability, vital for the region's varied environmental conditions.

Robust and Reliable Construction: Designed to withstand the demanding conditions of anaerobic digestion, adapting to the unique challenges of the Balkan region.

Highly Efficient Mixing System: Ensures optimal contact between feedstock and microorganisms for maximum biogas production from local organic waste.

Precise Temperature Control Capabilities: Maintains stable operating conditions for consistent and efficient biogas production, essential for the region's climate variations.

Customizable Design and Engineering: Tailored to meet specific project requirements and site conditions in Bosnia and Herzegovina.

Proven Reliability and Consistent Performance: Ensures consistent and efficient biogas production, contributing to the success of biogas projects in the region.

Center Enamel's Commitment to Sustainable Energy Solutions in Bosnia and Herzegovina and the Balkans

Center Enamel is dedicated to providing innovative and sustainable solutions for biogas projects across the globe. The successful delivery of the CSTR reactor tanks to Bosnia and Herzegovina demonstrates our commitment to supporting the development of renewable energy and contributing to a cleaner, more sustainable future for the region.

Partnering for a Greener Future in Bosnia and Herzegovina and the Balkans

Center Enamel is proud to partner with organizations in Bosnia and Herzegovina and throughout the Balkan region to advance the adoption of biogas technology. We offer a comprehensive range of solutions and support services, including:

Engineering and Design

Manufacturing and Installation

Technical Support and Maintenance

Comprehensive Project Consultation

Contact Us Today to Discuss Your Biogas Project Needs in Bosnia and Herzegovina:

For more information about Center Enamel's CSTR reactors and our comprehensive biogas solutions, please contact us today. Our expert team is ready to assist you in designing and implementing a customized solution that meets your specific project requirements in Bosnia and Herzegovina.


Best Center Enamel Drives Biogas Development in Bosnia and Herzegovina with Advanced CSTR Reactor Tanks wholesale

Center Enamel Drives Biogas Development in Bosnia and Herzegovina with Advanced CSTR Reactor Tanks Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shijiazhuang Zhengzhong Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0